Navigering mellem UL, CE og IEC: En guide til battericertificering for global overholdelse af medicinsk udstyr

Navigering i UL, CE og IEC: En guide til battericertificering for global overholdelse af medicinsk udstyr

Hurtigt svar: Ask for evidence at four levels: the supplier’s quality system, the proposed battery model, the configuration being shipped, and the complete medical device. Match each document to the legal entity, site, model, edition and revision it covers. Build the schedule around the evidence gaps and the laboratory’s confirmed test scope.

Part 1: Define What You Are Qualifying

Start with the device, its intended use and the markets in which it will be sold. Record whether the battery is sold separately, installed in the device or shipped alongside it. Include the approved cell, pack revision, BMS firmware, enclosure, connector and charging interface in the project file. This lets procurement compare quotes on the same configuration and gives quality a way to spot documents that cover a different pack.

For application examples, see Large Powermedicinske batteriløsninger. For advice on sizing and verifying the battery with the host, see the medical battery OEM guide.

Part 2: Match Each Standard or Mark to the Right Evidence

BeviserHvad det dækker overHvad OEM'en skal verificere
ISO 13485: 2016Kvalitetsstyringssystem.Legal entity, site, certified activities, application scope, issuer and validity.
IEC 62133-2Safety requirements and tests for portable sealed secondary lithium cells and batteries within its scope.Exact cell or battery model, tested configuration and applicable edition. If a CB certificate is supplied, check the associated CB test report and the named standard.
UL 2054Household and commercial battery safety within the standard’s scope.Whether the project calls for this standard and whether the model is covered by the stated listing, certification or test report.
FN 38.3Lithium cell and battery design tests for transport.Test summary and model identifiers, plus the shipment requirements for the selected mode and configuration.
IEC 60601-1Basic safety and essential performance of medical electrical equipment within its scope.The complete-device configuration, the applicable edition and any relevant collateral or particular standards.
EU battery conformity og medical-device conformitySeparate obligations may apply to the battery and the finished device under the relevant EU legislation.Applicable assessment procedure, technical documentation, EU declaration of conformity and CE marking obligations for each product. Check the IVDR pathway for IVD products where applicable.
Large Power SGS ISO 13485 certificate CN25/00006928
The published SGS certificate covers the design and manufacture of lithium batteries for non-implantable active medical devices at Large Power’s listed Dongguan site.

For US device submissions, check the FDA recognized consensus standards entry for the relevant standard, edition and extent of recognition. For EU battery removability and replaceability, Article 11 applies from 18 February 2027. Review the product category and applicable derogations, including provisions for certain professional medical imaging or radiotherapy devices and IVDs. Europa-Kommissionens vejledning · Delegeret forordning (EU) 2026/1770.

Part 3: Plan the Laboratory Schedule

Ask the laboratory to distinguish document review, sample preparation, sample acceptance, testing and document issue. Confirm which work can run in parallel and which depends on an approved sample or existing cell documentation. Keep a separate allowance for design changes, sample rebuilding and retesting.

Arbejds strømReferencevindueOmfang at bekræfte
UL 20545 ugerBattery pack evaluation. The reference assumed existing UL 1642 cell evidence.
CB4 ugerConfirm the underlying standard, existing cell documentation and the certificate and report deliverables.
UN 38.3 and air/sea transport documentation3 ugerConfirm the planned battery configuration and the transport documents included.
EMC testing for EU conformity work2 ugerConfirm the EMC test scope and sample configuration. This window covers the quoted EMC workstream.

Planning basis: These were project-specific estimates for one 6S1P lithium battery pack. Ask the laboratory to confirm the start event, accepted samples and deliverables for the proposed configuration. The figures are individual workstream estimates. Schedule device conformity assessment and document release separately.

Large Power internt batteritestlaboratorium
Large Power's interne batteritestlaboratorium.

Part 4: Build the Supplier Qualification File

  • Leverandørkvalitet. Keep the current scope certificate and confirm that the manufacturing site on the certificate matches the proposed build site.
  • Product records. Collect the released pack specification, drawings, model identifiers and applicable test reports for the configuration you intend to buy.
  • Transport evidence. Match the test summary to the battery design and confirm the planned shipping mode and configuration with your transport team.
  • Traceability and changes. Ask how the supplier traces serial numbers to cell lots, BMS firmware and production tests. Agree who approves changes and what evidence triggers reassessment.

Brug testing and certification capabilities page when discussing reports and testing with Large Power. Det custom battery pack development guide explains when to review evidence during EVT, DVT, PVT and production release.

Ofte stillede spørgsmål

How long should an OEM allow for battery testing and documentation?

Use the reference windows above to start a discussion. Ask the laboratory for a project schedule tied to confirmed sample readiness, current reports and the agreed scope. Allow additional time for retesting or a change to the intended battery configuration.

Can supplier reports be reused for another battery model or a new market?

Ask the laboratory and regulatory team to review the exact configuration, applicable edition and target-market requirements. Record any differences in cells, wiring, firmware, housing or charging conditions and agree which evidence remains applicable.

What should purchasing review before placing a production order?

Confirm the approved model and revision, manufacturing site, traceability records, required shipment documents and change-notification process. Retain the complete-device verification records with the OEM’s product file.

Send din forespørgsel i dag

Pop-up tilbudsformular

Relaterede Produkter

Relaterede nyheder

En OEM-guide til brugerdefinerede robotbatteripakker til AGV'er, AMR'er og humanoider. Specificer driftscyklus, integrer BMS og oplader, og verificer pakker før frigivelse.

Hurtigt svar: Definer, hvad den medicinske enhed skal gøre, når den eksterne strøm afbrydes, eller batteriet er lavt. Konverter […]

Hurtigt svar: Dimensionér lithiumbatteripakken til både kompressorens opstartsspændingsfald og den energi, der bruges i løbet af dens […]

Hurtigt svar: Definer advarselsmargenen for lav opladning som den minimale brugbare tid mellem alarmen og den nødvendige enhedshandling. […]

Rul til top

Få et gratis tilbud nu!

Pop-up tilbudsformular
Hvis du har spørgsmål, så tøv ikke med at kontakte os.
Kundeorienterede, brugerdefinerede batteriløsninger1